Update history​

CYPE Cost Estimator

New countries

The following countries have been added, together with their federal entities or provinces, in the geographic and economic data of "Phase I. Preliminary analysis":

  • Saudi Arabia
  • United Arab Emirates
  • Israel
  • Kuwait
  • Philippines
  • Korea (Republic of)
  • Qatar
  • China
  • Hong Kong
  • India
  • Japan
  • Macau
  • Pakistan
  • Singapore
  • Taiwan
  • Malaysia
  • Denmark
  • Argentina
  • Ecuador
  • Peru
  • Honduras
  • Bolivia (Plurinational State of)
  • Paraguay
  • Guatemala

Cost database update

The cost database that is used by the application to establish the construction cost estimate has been revised. Projects that have been carried out using earlier program versions will be updated automatically when they are opened with the 2021.f version.

New countries

Mali and Cape Verde, together with their respective federal entities or provinces, have been added to the list of countries that can be selected within the geographical configuration of the project (Phase I: Previous studies). CYPE Cost Estimatoruses the location of the project to determine the geographic and socioeconomic factors that will be applied to the prices used to elaborate the budget.

Help

Help texts have been added in the different input parameters of the application to help users interpret the parameters correctly.

Edit the currency exchange value

As of the 2019.f version, the exchange value of the currency used in the project can be changed to Euros.

CYPE Cost Estimatorincludes the exchange values for the currencies corresponding to the countries that are contemplated in the application. However, due to the volatility of some currencies and the difficulty to keep them updated, we have considered it would convenient for the user to have the possibility to controlthis factor directly.

Climate and seismic data

As of the 2019.f version, CYPE Cost Estimatorcontemplates the climate and seismic data that affects the budget of the building. These factors are the following:

  • Thermal conditions
    The outdoor temperature affect the design and parameters of the envelope and thermal installations of the building, especially the cost of the insulations and the exterior carpentry.
  • Wind intensity
    The dynamic pressure of the wind conditions the design, parameters and cost of the structure and exterior carpentry.
  • Wind exposure grade
    Affects the cost of the structure and exterior carpentry, especially in buildings located near cliffs, the seaside and rural areas without obstacles, amongst others.
  • Seismic risk
    Seismic action influence the design of the foundation and the structure, and therefore, affect the final cost of the building.

64-bit Version

As of the 2019.f version, CYPE programs (those downloaded from our website and those downloaded from the BIMserver.center platform) are compiled for 64-bit systems. The 64-bit compilation of CYPE software implies the use of the superior features of 64-bit processors and operating systems compared to those of 32 bits.

Please bear in mind that you must have a 64-bit operating system to be able to work with any 64-bit software.

In any case and as a temporary measure, the 2019.f version is available in 64 and 32 bits on the download area of our webpage. The programs that can be downloaded from the BIMserver.center platform are only available in 64 bits. If you have a 64-bit operating system, you can work with either the 64-bit and 32-bit version of our software, although we strongly recommend that you install the 64-bit CYPE software version.

You can see which operating system is installed on your computer by clicking on "Control panel > System".

Since 64-bit microprocessors began to be massively introduced into personal computers from 2003 and from the Windows XP version, Microsoft already offers the two versions of its operating systems (32 and 64 bits). We understand that almost all our users will have computers with 64-bit processors (x64) and 64-bit operating systems.

It could occur that a user may wish to work with a computer with a 64-bit processor but with a 32-bit operating system. It would be very strange if the computer had a 32-bit processor (x86 - computers over 15 years old). If any of these is your case, we advise you to talk to your hardware or software provider to update your situation as soon as possible. However, you can download the 32-bit version and work with CYPE programs that can be downloaded from our website until your situation is up-to-date.

CYPE Cost Estimator(new program)

Open BIM Cost Estimator has been conceived to carry out an automatic estimate of the execution budget of a building project during the preliminary phases of the architectural project, in a simple and practical way, using a fast, efficient and precise analysis model, which contemplates the built surface, the height of the building, and typological, constructive, geographic and socioeconomic factors.

The user license permits that are required to work with “Open BIM Cost Estimator” depend on the value of the execution budget that has been calculated by the program:

  • Up to 1,000,000 €
    The program is free.
  • Up to 5,000,000 €
    The user license must include the CYPE Cost EstimatorPro permit.
  • Over 5,000,000 €
    The user license must include the CYPE Cost EstimatorExpert permit.

CYPE Cost Estimatorcan be downloaded from the BIMserver.center platform.

CYPE Cost Estimatoris included in the Open BIM workflow. The program reads the geometry of the building from the project BIM model to show its 3D view and exports the execution budget of the project to the BIM model (in pdf format) and the documents that are required to be used by “CYPE Memorias CTE”.

More information on this new CYPE tool will be available shortly.