The applications included in the Open BIM workflow of the 2019.g version include new requirements and errors that are communicated between them.
- Between “Open BIM Residential Furniture” and “Open BIM Electrical Mechanisms”
Electrical outlets should be introduced near electrical appliances. - Between “CYPEFIRE CTE” and “IFC Builder”
The horizontal and vertical dimensions of façade openings must be at least 0.80 m and 1.20 m respectively, and be located at a height, with respect to the floor, not exceeding 1.20 m, according to DB SI 5 Fire-fighter intervention - Section 2.
The requirements and errors that are currently implemented in the Open BIM workflow can be found in the “List of requirements and errors” section of the “Open BIM workflow requirements” webpage.