To design and/or check the power provided by the equipment in a precinct, the program offers users the option to distribute the thermal load amongst the installation elements that have been introduced in each precinct. In this sense, the program offers two criteria to carry out the distribution:
- Simultaneous
Distributes the load amongst the installed systems in accordance with their priority. - Independent
Separately assigns the total load of the precinct to each system, as the total required power.
If users select Simultaneous, they will establish the priority of the different systems to be used during the thermal load distribution of the precincts.