Solutions for professionals

Share
Associated programs

Data input and output sequence for the design and analysis of water supply systems

The design and analysis of a water supply system can be carried out in the program using the following input and output sequence:

  1. Creation of a new job (from "File", "New").
  2. (Optional) Link to BIMserver.center and import of topographic data from the BIM model.
  3. Configuration of general data of the system (in the wizard for the creation of a new job or in "General data", "Edit general data of the job"), including the definition of materials and terrains.
  4. Defining loadcases and combinations (from "General data", "Edit loadcases", and from "General data", "Edit combinations").
  5. (Optional) Import of DXF-DWG/DWF templates or images (from "Edit templates").
  6. Entering nodes (from "Nodes", "New").
  7. Entering spans between nodes (from "Sections", "New").
  8. (Optional) Entering other elements in the system (from "Elements", "New").
  9. Analysis and/or design of the system (from "Analysis", "Analysis/Design").
  10. Review of the compliance status of the checks carried out (from the "Next combination/Select combination/Previous combination" options) and of the analysis results (from "Nodes", "Information", and "Sections", "Information").
  11. Printing reports and drawings of the job (from "File", "Reports/Drawings").
  12. (Optional) Exporting to BIMserver.center (from "BIMserver.center", "Share").