Introduction
When the CYPETHERM program is set to the "Improvement measures analysis" project type, it provides a specific interface for managing improvement measures or alternative building designs, where it is possible to generate a study of the improvement measures, including an energy and economic analysis of each one, calculating the payback period using static or dynamic analysis methods (Net Present Value).
In this specific interface, the program displays the building’s energy performance indicators for the various design options (such as the initial reference scenario and the scenarios obtained by applying each of the improvement measures), and lets you enter a description and the associated costs.
Energy performance indicators are imported from the simulations carried out in the program’s main calculation interface and previously shared with the BIMserver.center project to which the building is linked.
