- Matching of joist top reinforcement and positive moments for all the floor groups of the building
It is possible to match the top reinforcement of joists and their positive moments on all floor groups without the need of having to change to another group. To do so, the commands Match top reinforcement (Results tab > Joists > [Top reinf.] Match) and Match joists (Results tab > Joists > [Bottom reinf] Match) contain two options: Match in all groups and Match in current group. - Joist force diagrams per rib or per metre slab width
The joist force diagrams can be viewed with their values per rib or per metre slab width. The way in which the results are expressed can be configured for viewing on screen as well as for the joist force reports:- On screen
In the Forces in joists dialogue box (Results tab > Envelopes > Forces in joists) two options have been included: Values per rib and Values per metre width - In joist force reports
In the Force envelopes report (from any tab > File > Print > Job report > Forces in joists > select group(s)) the Values per rib and Values per metre width options can also be activated.
- On screen