Report templates and report series
The following table lists the report templates and report series available by default in the Arquimedes installation:
Reports
| Type | Name | File | Language |
| Analysis | Analysis by nature Auxiliary item percentage analysis Work section percentage analysis Labour percentage analysis Floors percentage analysis Materials percentage analysis Percentage analysis of items Resource percentage analysis | pl_ana01.pla pl_00198.pla pl_00199.pla pl_00200.pla pl_00201.pla pl_00202.pla pl_00115.pla pl_00203.pla | Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language |
| Cost database | Price list (for 2 work section levels) Pricelist (without breakdown details) Report of parametric cost database Own specifications of cost database concepts | pl_00132.pla pl_00206.pla pl_00146.pla pl_00147.pla | Multi-language Multi-language Multi-language Multi-language |
| Partial cert. | Detailed certificate (4 columns) Partial certificate report (with detail) | pl_00209.pla pl_00218.pla | Multi-language Multi-language |
| Summary certificate | Invoice for client Certificate summary with work section percentages Certificate report summary | pl_00213.pla pl_00212.pla pl_00230.pla | Multi-language Multi-language Multi-language |
| Certificate | Certificate to origin (simple) Certificate to origin (simple) current or closed Certificate to origin (simple, without quantity) Certificate to origin (not credited) Certificate with deductions Detailed certificate (4 columns) Detailed certificate + summary sheet Detailed certificate + summary sheet (2) Contracted/certified comparative study Settlement Details of certificates carried out Details of certificates carried out (variable VAT) Certificate report Certificate report with indication of the partial certificate of each item Summary of certificate reports Certificate table | pl_00136.pla pl_00161.pla pl_00137.pla pl_00126.pla pl_00204.pla pl_00125.pla pl_00135.pla pl_00207.pla pl_00105.pla pl_00224.pla pl_00143.pla pl_00155.pla pl_00163.pla pl_00229.pla pl_00225.pla pl_00215.pla | Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language |
| Analytical codes | Annex of price justification by analytical codes Bill of quantities by analytical codes (multilevel) | pl_00148.pla pl_00149.pla | Multi-language Multi-language |
| Comparatives | Comparative between valid and modified BOQ Comp. BOQ (1 comp., landscape, with differences) Comparative bills of quantities Comparative bills of quantities (2) Comparative bills of quantities with difference (landscape) | pl_00223.pla pl_00183.pla pl_00182.pla pl_00208.pla pl_00197.pla | Multi-language Multi-language Multi-language Multi-language Multi-language |
| Project control | Agenda Delivery notes Delivery notes with uncharged supplies Delivery notes pending invoice Job analysis Subcontract analysis using contract analysis Subcontract analysis for the preview of the job Profit Certificate for subcontractor Certificate of execution excess for subcontractor Expenses comparative Purchase comparatives Resources which do not appear in documents Consumption per items Consumptions organised by supplies Contracts Budget variances in work sections Budget variances in items Budget variances in items (+ Yield) Budget variances in items (Theoretical quantity) Variances between documents Variances between budget and delivery notes Variances between budget and invoices Execution details (4, 5 or 6 columns) Account status of the clients Account status of the suppliers Comparative price study Stocks Invoices by month (with supply and due payment details) Emitted invoices Received invoices Received invoices (with supply details) Invoices received with uncharged supplies Purchasing groups Charges with supply details Material order to suppliers Offer requested to suppliers Orders Foreseen payments to suppliers Job execution and cost situation Supplier offer requests Delivery note supplies organised by date Supplies by concepts Supplies by date Supplies by supplier Certificate table for subcontractor Due payments to collect Due payments to collect (II) Due payments to collect by date Due payments to pay Due payments to pay (II) Due payments to pay by date | pl_cb013.pla pl_cb021.pla pl_cb037.pla pl_cb024.pla pl_cb046.pla pl_cb041.pla pl_cb040.pla pl_cb031.pla pl_cbsub002.pla pl_cbsub003.pla pl_cb007b.pla pl_cb042.pla pl_cb038.pla pl_cb025.pla pl_cb002.pla pl_cb044.pla pl_cb008.pla pl_cb007.pla pl_cb007a.pla pl_cb007c.pla pl_cb004.pla pl_cb005.pla pl_cb006.pla pl_cb012.pla pl_cb014.pla pl_cb001.pla pl_cb035.pla pl_cb009.pla pl_cb030.pla pl_cb017.pla pl_cb018.pla pl_cb019.pla pl_cb036.pla pl_cb045.pla pl_cb034.pla pl_cb028.pla pl_cb029.pla pl_cb020.pla pl_cb043.pla pl_cb011.pla pl_cb039.pla pl_cb010.pla pl_cb003.pla pl_cb026.pla pl_cb027.pla pl_cbsub001.pla pl_cb015.pla pl_cb033.pla pl_cb023.pla pl_cb016.pla pl_cb032.pla pl_cb022.pla | Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language |
| CTE | Price justification annex Price justification annex (V Bill of quantities) Labour report Labour report (V Bill of quantities) Floors report Floors report (V Bill of quantities) Material schedule Material schedule (V Bill of quantities) Pricelist nº1 Pricelist nº1 (V Bill of quantities) Pricelist nº2 Pricelist nº2 (V Bill of quantities) Quantities Quantities (IV Quantities) Bill of quantities Bill of quantities (IV - V Bill of quantities) Bill of quantities Bill of quantities (V Bill of quantities) Bill of quantities (V Bill of quantities) + Description Summary of the budget Summary of the budget Summary of the budget Summary of the budget Summary of the budget (V Bill of quantities) | pl_mcte_anejo.pla pl_cte005.pla pl_mcte_cmob.pla pl_cte002.pla pl_mcte_cmaq.pla pl_cte004.pla pl_mcte_cmat.pla pl_cte003.pla pl_mcte_cpn1.pla pl_cte007.pla pl_mcte_cpn2.pla pl_cte008.pla pl_mcte_med.pla pl_cte009.pla pl_mcte_medpres.pla pl_cte001.pla pl_mcte_pres.pla pl_cte010.pla pl_cte010_2.pla pl_mcte_pec.pla pl_mcte_pec_pb.pla pl_mcte_pem.pla pl_mcte_pem_pb.pla pl_cte006.pla | Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language |
| Labour list | Job report Labour list (E-MOPU) | pl_00107.pla pl_00131.pla | Multi-language Multi-language |
| Floors report | Floors report Machinery report (E-MOPU) | pl_00128.pla pl_00130.pla | Multi-language Multi-language |
| Materials report | Material schedule Materials report (E-MOPU) | pl_00129.pla pl_00127.pla | Multi-language Multi-language |
| Pricelist nº1 | Pricelist nº1 (code) Pricelist nº1 (hierarchy) Pricelist nº1 with warning (code) Pricelist nº1 with warning (hierarchy) Price offer | pl_00106.pla pl_00138.pla pl_00111.pla pl_00156.pla pl_00210.pla | Multi-language Multi-language Multi-language Multi-language Multi-language |
| Pricelist nº2 | Analysis of resources Pricelist nº2 (breakdown in resources) Pricelist nº2 (breakdown in resources)(2) Pricelist nº2 (breakdown in resources)(3) Pricelist n.º 2 (E-MOPU) Pricelist nº2 (hierarchy)(Partial payments) Pricelist nº2 with warning (Partial payments) Pricelist nº2 with warning Pricelist nº2 with warning (hierarchy) (Partial payments) | pl_00211.pla pl_00160.pla pl_00196.pla pl_00219.pla pl_00119.pla pl_00159.pla pl_00112.pla pl_00133.pla pl_00157.pla | Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language |
| Auxiliary price list | Auxiliary price list Auxiliary price list | pl_00110.pla pl_00134.pla | Multi-language Multi-language |
| Two currencies | Price justification annex Certificate Labour list Machinery report Material schedule Auxiliary price list Pricelist nº1 Pricelist nº2 BOQ summary sheet Bill of quantities | pl_00190.pla pl_00191.pla pl_00187.pla pl_00188.pla pl_00189.pla pl_00192.pla pl_00193.pla pl_00194.pla pl_00181.pla pl_00180.pla | Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language |
| EVM | Earned value management (depending on the approach of the construction manager) | pl_evm01.pla | Multi-language |
| Excel | Cost database Certificate Partial certificate Bill of quantities Bill of quantities (Study) Bill of quantities (Sales) | pl_exc04.pla pl_exc02.pla pl_exc03.pla pl_exc01.pla pl_exc01_pe.pla pl_exc01_pv.pla | Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language |
| Gantt | Daily labour chronogram Daily plants chronogram Payment plan details Payment plan details (II) Gantt chart | pl_gnt02.pla pl_gnt03.pla pl_gnt04.pla pl_gnt04_ii.pla pl_gnt01.pla | Multi-language Multi-language Multi-language Multi-language Multi-language |
| Images | Price justification annex Cost database Labour list Plants list Material schedule Auxiliary price list Pricelist nº1 Pricelist nº2 CEB summary sheet Summary sheet of CEB with VAT (with work section list) Summary sheet of MEB (Multilevel) Quantities Quantities (2) Specifications Bill of quantities | pl_00166.pla pl_00167.pla pl_00168.pla pl_00169.pla pl_00170.pla pl_00171.pla pl_00172.pla pl_00173.pla pl_00174.pla pl_00176.pla pl_00175.pla pl_00177.pla pl_00195.pla pl_00178.pla pl_00179.pla | Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language |
| Hierarchy | Example of item breakdown into LA, PL and MT Example of recursive hierarchy of work sections and items | pl_00104.pla pl_00101.pla | Multi-language Multi-language |
| Price justif. | Price justification annex Price justification annex (2) Annex of price justification (by hierarchy) Annex of price justification (by hierarchy) (2) Annex of price justification (Contradictory prices) Annex of price justification (Contradictory prices) (2) Price justification (with partial payments) Price justification (with partial payments)(2) | pl_00114.pla pl_00114_2.pla pl_00141.pla pl_00141_2.pla pl_00141a.pla pl_00160a.pla pl_00214.pla pl_00214_2.pla | Multi-language Multi-language Multi-language Multi-language Español Español Multi-language Multi-language |
| Location codes | Example of location work sections and items Example to view item location codes Quantities by location codes (1, 2 or 3 levels) Partial budget of the location code selected by work sections Bill of quantities by location with work sections | pl_00109.pla pl_00118.pla pl_00145.pla pl_loc001.pla pl_loc002.pla | Multi-language Multi-language Multi-language Multi-language Multi-language |
| Quantities | Quantities (4, 5 or 6 columns) Quantities (No details) Normal quantities (4 columns) Normal quantities (4 columns) (2) | pl_00186.pla pl_00216.pla pl_00113.pla pl_00165.pla | Multi-language Multi-language Multi-language Multi-language |
| Multi-VAT | Certificate Summary sheet of the Tender Global Budget with multiple types of VAT | pl_muliva01.pla pl_muliva02.pla | Multi-language Multi-language |
| Specifications | Specifications | pl_00144.pla | Multi-language |
| Bill of quantities | Price offer closure Blind bill of quantities (only quantities) Study budget Sales budget Bill of quantities by quantities Bill of quantities by quantities (2) Bill of quantities by work sections + MEB sheet Bill of quantities by work sections + MEB sheet (Multilevel) Bill of quantities (4 columns) + MEB Bill of quantities (4 columns) + MEB (mod. 2) Bill of quantities (4 columns) + MEB (mod. 3) Bill of quantities (5 columns) + MEB sheet Bill of quantities (6 columns) + MEB sheet Partial budgets Valuation of ten-year maintenance | pl_00228.pla pl_00100.pla pl_00227.pla pl_00226.pla pl_00103.pla pl_00184.pla pl_00116.pla pl_00151.pla pl_00123.pla pl_00124.pla pl_00140.pla pl_00150.pla pl_00185.pla pl_00217.pla pl_00220.pla | Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language |
| References | Use of resources Justification of the total resource quantities used in items | pl_00102.pla pl_00221.pla | Multi-language Multi-language |
| Waste | Construction and demolition waste | pl_residuos01.pla | Multi-language |
| Summary | Summary sheet of the AdjP and BTB (Multilevel) Summary sheet of CEB with VAT (with list of work sections and fees) Summary sheet of CEB with VAT (with work section list) Summary sheet of CEB with VAT (Multilevel) Summary sheet of CEB without VAT (with work section list) Summary sheet of CEB without VAT (Multilevel) Summary sheet of CEB (with work section list) Summary sheet of MEB (Multilevel) | pl_00222.pla pl_00205.pla pl_00120.pla pl_00154.pla pl_00121.pla pl_00152.pla pl_00108.pla pl_00153.pla | Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language Multi-language |
| Revit | 00-KEYNOTE Revit 00-KEYNOTE Revit Materials | pl_exp01.pla pl_exp02.pla | Multi-language Multi-language |
| Selection | List of selected concepts | pl_00122.pla | Multi-language |
| DL selection | Bill of quantities of selected work sections | pl_00117.pla | Multi-language |
Report series
| Type | Name | File | Language |
| Lists | Pricelists Pricelists with warnings | sl_00101.sla sl_00102.sla | Multi-language Multi-language |
| Bill of quantities | Example of reports of a bill of quantities | sl_00100.sla | Multi-language |