Data input and output sequence for the analysis of improvement measures or design alternatives
Data can be imported and managed within the program to carry out the economic and energy analysis of improvement measures or design alternatives, using the following sequence of data input and output.
- Create a new project (from "File", "New") and select the "Improvement measures" option.
- (Optional) Link to BIMserver.center and import the data for the previously shared design alternatives into the BIMserver.center project.
- Review and adjustment of the various design scenarios or alternatives:
- If the project has been linked to BIMserver.center, several design alternatives will have been generated automatically.
- In any case, if the project has not been linked to BIMserver.center, you can manually create new improvement measures or design alternatives using the "New improvement measure" option in the "Data management" section.
- Review and adjustment of data for different design scenarios or alternatives, including the "Description" and "Costs" (by selecting each situation from the tree on the left-hand side of the interface and entering the required data on the right):
- If the project has been linked to BIMserver.center, the "Performance indicators" data will have been generated automatically.
- In any case, if the project has not been linked to BIMserver.center, the data for the "Performance indicators" can be entered and edited manually.
- Configure the general data (under "Project", "General data") if you wish to carry out an economic analysis of the design alternatives.
- Retrieve the report on improvement measures, including its economic and energy analysis (from the "Reports" section).
- Export to BIMserver.center (from "BIMserver.center", "Share").