Several column design and check processes have been improved to optimise analysis times. In some cases, such as for projects where seismic loads have been applied, the time required to analyse the project has been reduced significantly.
Several column design and check processes have been improved to optimise analysis times. In some cases, such as for projects where seismic loads have been applied, the time required to analyse the project has been reduced significantly.