Manual design of air-conditioning systems
To define the air-conditioning systems manually in the program, you must enter terminal units for each zone (in the "Terminal units" section) and, if necessary, the associated centralised supply system (in the "Air conditioning systems" section).
The following links set out the procedure to follow in each case:
The following table shows the combinations of air-conditioning systems and terminal units that must be entered into the program to model different types of installation:
| Type of installation | Air conditioning system | Terminal unit |
| Consistent-performance team | None (no need to set up a centralised production system) | - Consistent-performance equipment |
| Installation of electric radiators | None (no need to set up a centralised production system) | - Electric heater |
| Installation of a boiler, chiller and fan coils (air-cooled condenser) | - Water-based heating and cooling systems. Water-based heating system – Water-based heating and cooling systems. Water-based cooling system | - Water terminal unit. Fan coil unit |
| Boiler and radiator installation | - Water-based heating and cooling systems. Water-based heating system | - Water terminal unit. Radiator |
| Boiler and underfloor heating installation | - Water-based heating and cooling systems. Water-based heating system | - Water terminal unit. Underfloor heating |
| Aerothermal system with fan coils | - Water-based air-conditioning systems. Air-source heat pump system | - Water terminal unit. Fan coil unit |
| Geothermal installation with fan coils | - Water-based heating and cooling systems. Geothermal heat pump – Water-based condensation system at a set temperature | - Water terminal unit. Fan coil unit |
| VRF/VRV system (air-cooled condenser) | - Direct expansion systems. Variable refrigerant flow (VRF) | - Direct expansion terminal unit. Variable refrigerant flow (VRF) |
| 1x1 split system installation | None (no need to set up a centralised production system) | - Direct expansion terminal unit. 1x1 split system |
| Multi-split installation | - Direct expansion systems. Multisplit | - Direct expansion terminal unit. Multisplit |
| Installation of compact equipment (electric/gas) | None (no need to set up a centralised production system) | - Direct expansion terminal unit. Compact unit |
| Installation of compact equipment (hot water) | - Water-based heating and cooling systems. Water-based heating system | - Direct expansion terminal unit. Compact unit |
| Installation of a zone-based heat recovery unit | None (no need to set up a centralised production system) | - Heat recovery unit |
| Centralised ventilation system with heat recovery unit | - Central ventilation system. Heat recovery unit | - Air terminal unit. Air supply terminal |
| Centralised ventilation system with primary air conditioning unit | - Central ventilation system. Dedicated outdoor air system (DOAS) | - Air terminal unit. Air supply terminal |
| Installation of a constant-flow air conditioning unit | - Air handling unit, constant air flow system | - Air terminal unit. Air supply terminal |
| Installation of a variable-flow air-conditioning unit | - Air handling unit, variable airflow system | - Air terminal unit. Variable air volume unit |
| Installation of a constant-flow, dual-duct air-conditioning system | - Air handling unit, variable flow all-air system with double duct | - Air terminal unit. Air supply terminal, dual-duct |
| Installation of a variable-flow, dual-duct air-conditioning system | - Air handling unit, variable flow all-air system with double duct | - Air terminal unit. Variable air volume unit, dual-duct |