CYPETHERM. "Systems" tab – Manual definition of air-conditioning systems

Share
Associated programs

Manual design of air-conditioning systems

To define the air-conditioning systems manually in the program, you must enter terminal units for each zone (in the "Terminal units" section) and, if necessary, the associated centralised supply system (in the "Air conditioning systems" section).

The following links set out the procedure to follow in each case:

The following table shows the combinations of air-conditioning systems and terminal units that must be entered into the program to model different types of installation:

Type of installationAir conditioning systemTerminal unit
Consistent-performance teamNone (no need to set up a centralised production system)- Consistent-performance equipment
Installation of electric radiatorsNone (no need to set up a centralised production system)- Electric heater
Installation of a boiler, chiller and fan coils (air-cooled condenser)- Water-based heating and cooling systems. Water-based heating system
– Water-based heating and cooling systems. Water-based cooling system
- Water terminal unit. Fan coil unit
Boiler and radiator installation- Water-based heating and cooling systems. Water-based heating system- Water terminal unit. Radiator
Boiler and underfloor heating installation- Water-based heating and cooling systems. Water-based heating system- Water terminal unit. Underfloor heating
Aerothermal system with fan coils- Water-based air-conditioning systems. Air-source heat pump system- Water terminal unit. Fan coil unit
Geothermal installation with fan coils- Water-based heating and cooling systems.
Geothermal heat pump
– Water-based condensation system at a set temperature
- Water terminal unit. Fan coil unit
VRF/VRV system (air-cooled condenser)- Direct expansion systems. Variable refrigerant flow (VRF)- Direct expansion terminal unit. Variable refrigerant flow (VRF)
1x1 split system installationNone (no need to set up a centralised production system)- Direct expansion terminal unit. 1x1 split system
Multi-split installation- Direct expansion systems. Multisplit- Direct expansion terminal unit. Multisplit
Installation of compact equipment (electric/gas)None (no need to set up a centralised production system)- Direct expansion terminal unit. Compact unit
Installation of compact equipment (hot water)- Water-based heating and cooling systems. Water-based heating system- Direct expansion terminal unit. Compact unit
Installation of a zone-based heat recovery unitNone (no need to set up a centralised production system)- Heat recovery unit
Centralised ventilation system with heat recovery unit- Central ventilation system. Heat recovery unit- Air terminal unit. Air supply terminal
Centralised ventilation system with primary air conditioning unit- Central ventilation system. Dedicated outdoor air system (DOAS)- Air terminal unit. Air supply terminal
Installation of a constant-flow air conditioning unit- Air handling unit, constant air flow system- Air terminal unit. Air supply terminal
Installation of a variable-flow air-conditioning unit- Air handling unit, variable airflow system- Air terminal unit. Variable air volume unit
Installation of a constant-flow, dual-duct air-conditioning system- Air handling unit, variable flow all-air system with double duct- Air terminal unit. Air supply terminal, dual-duct
Installation of a variable-flow, dual-duct air-conditioning system- Air handling unit, variable flow all-air system with double duct- Air terminal unit. Variable air volume unit, dual-duct
CYPE Mentor