Data input and output sequence for the acoustic analysis of a building
The design and verification of the sound insulation and conditioning level of a building can be carried out in the program using the following input and output sequence:
- Creating a new job (from "File", "New").
- (Optional) Linking to BIMserver.center. Importing the building geometry and construction systems from the BIM model is possible.
- Reviewing and setting the code, the use of the building and the general parameters (options in the "General data" group).
- Defining the acoustic model in the "Model" tab:
- Defining the characteristics of the spaces through the management of their libraries ("Project" panel, side tree "Building", "Library", "Spaces").
- (Optional) If the construction systems have not been previously imported, defining the characteristics of the building elements through the management of their libraries ("Project" section, side tree "Building", "Library").
- (Optional) Defining the equipment libraries ("Project" panel, side tree "Building", "Library", "Equipment") and inserting them in the project tree ("Project" panel, side tree "Building", "External equipment").
- Managing the use units (options in the "Use units" group).
- In the "Analysis" tab, under "Analysis", the analysis is carried out and the results are consulted:
- (Optional) Checking the general parameters and the configuration of the report (options in the "Analysis" group).
- Acoustic analysis of the building ("Analysis" group, "Analyse").
- (Optional) On-screen display of analysis results and detailed results reports in the project tree ("Building" side tree of the "Project" panel).
- Obtaining reports (using the options in the "Reports" group).
- Exporting to BIMserver.center ("BIMserver.center" group, "Share").