Entering domestic hot water production equipment in the water supply system

In the "Installation" tab of the "Water Systems" tab, in the "Hot water" group of the main toolbar, there is an option for inserting domestic hot water (DHW) production equipment into the water supply system:

Hot water production

Enters domestic hot water production equipment into the water supply system.

When entering or editing DHW production equipment, the following parameters can be configured. Some parameters only appear if the "Simplified entry" option, which can be found in "Calculation options" under "General options", is deactivated:

  • Reference
    Element reference. This value can be locked or unlocked. If unlocked, the program will create or modify the reference when updating the results.
  • Reference of the hot water production equipment
    The type of DHW production equipment can be selected by its reference. These types can be created and edited by means of "Design and check options to be carried out", which can be found in "General options", in the "Project" group.
  • General data
    Defines the general data of the element. Some of these values can be locked or unlocked. If a value is locked, when updating the results it is not modified but remains unchanged.
    • Storage tank / Instant water heater
      Selects the DHW production equipment from those defined in "Material and equipment selection", under "General options", in the "Project" group.
    • Dimensions (Lock / Unlock)
      Selects the dimensions of the DHW production equipment by entering the capacity (in the case of storage heaters) or the flow rate (in the case of instant heaters).
    • Temperature (Lock / Unlock)
    • Consumption
      Defines the DHW consumption associated with the production equipment. With the button on the right-hand side, this data can be loaded from the values indicated for "Daily demand, per unit" (which can be configured in "Demand criteria", under "Analysis options" and, in turn, under "General options") and the number of "Units" provided by the equipment.
      • Reference
      • Description
      • Daily volume
      • Volume
      • Occupancy / Consumption / Temperature / Distribution
        They are defined for each month.
    • Flow (Lock / Unlock)
    • Pressure (Lock / Unlock)
  • 3D layout
    Defines the position and angle of the element. This section only appears when editing a previously entered element.
    • Position (x, y, z)
    • Angle
  • Label (optional)
    Manages the information visible in the element's label.
    • Reference
  • Bill of quantities
    Controls the generation of the element's bill of quantities by means of filters.
    • Hot water production
  • Consult checks
    Allows the checks carried out on the element to be consulted and listed. These checks can be activated, edited or deactivated in "Design and check options to be carried out", under "General options" in the "Project" group.
Storage tank
Instantaneous heater
Note:
The "Hot water" button in the lower right-hand corner of the group is used to access the options for defining the elements in this group.

These options are equivalent to those available in "Design and check options to be carried out" under "General options" in the "Project" group.

The hot water production equipment with the checked box will be available as additional quick access options in this tool group. This allows users to quickly enter the desired equipment.