StruBIM Shear Walls version 2021.g includes the correction of an error that could occur whilst carrying out normal loading checks when the angle between two consecutive sides of a polygon defining the wall section is close to 180º.
Update history
StruBIM Shear Walls
Improvements and corrections
- Published on
- 2021.g
General improvements
Version 2021.g of CYPE’s programs is a closing version of the 2021 version.
As well as the new features and improvements expressly indicated in each version of CYPE software, process optimisation involving internal updates for all our programs is normally included. In each revision, all programs are systematically checked and changes are made to improve their performance, therefore, we recommend that our users (in this case those of v.2021) always update their version to the latest one, regardless of the country for which they are using CYPE software or the language in which it is installed.
- Arquimedes, CYPE 3D, CYPE Accessibility, CYPE Architecture, CYPE Connect, CYPE Connect Classic, CYPE Construction Systems, CYPE Cost Estimator, CYPECAD, CYPEFIRE, CYPEFIRE Hydraulic Systems, CYPEHVAC, CYPEHVAC Radiant Floor, CYPELEC, CYPELEC Distribution, CYPELEC Electrical Mechanisms, CYPELEC PV Systems, CYPELUX, CYPESOUND, CYPETHERM EPlus, CYPETHERM LOADS, CYPEURBAN, IFC Builder, Open BIM Analytical Model, Open BIM Layout, Open BIM Quantities, Plugin Open BIM - Revit, Portal frame generator, StruBIM Cantilever Walls, StruBIM Deep Beams, StruBIM Embedded Walls, StruBIM Shear Walls, StruBIM Steel
- Published on
- 2021.g
Other improvements and corrections
Version 2021.f of StruBIM Shear Walls also includes other slight enhancements and corrections of errors that may appear on rare occasions:
- The distribution of vertical reinforcement bars in shear walls has been improved.
- The distribution of crossties in shear walls and coupling beams has been improved.
- The design process can now be cancelled.
- An error during the job update, which occasionally occurred after a shear wall had been added in CYPECAD, has now been fixed.
- Generating intervals in "Segment classification" if there are several unconnected segments in a section with the same direction has been improved.
- Checking transverse crossties in Eurocode type regulations has been improved. Previously, in some cases, not every crosstie was considered.
- The default value for "Minimum number of layers" in "Reinforcement layout criteria" has been changed to 2.
- Published on
- 2021.f
Selecting materials during the import of a BIM model
- Published on
- 2021.f
New reports
- Published on
- 2021.f
Other improvements and corrections
The 2021.e version of StruBIM Shear Walls also includes program corrections that solve errors that could arise in specific circumstances:
- Checks for normal forces
An error has been solved, which occurred when the program checked the normal forces in shear walls with a slight rotation with respect to the X-Y axes. - Import BIM models
An error has been solved, which occurred when users tried to import a BIM model that had been generated for a later version of the program.
- Published on
- 2021.e
Code implementation
The following Eurocode checks have been implemented in the 2021.e version of StruBIM Shear Walls:
- Concrete structures (Eurocode 2)
- EN 1992-1 (EU)
- EN 1992-1 (Bulgaria)
- NF EN 1992-1 (France)
- NP EN 1992-1 (Portugal)
- SR EN 1992-1 (Romania)
- MS EN 1992-1 (Malaysia)
- SS EN 1992-1 (Singapore)
- UNE-EN 1992-1 (Spain)
- Loads on structures. Seismic action (Eurocode 8)
- EN 1998-1 (EU)
- EN 1998-1 (Bulgaria)
- NF EN 1998-1 (France)
- NP EN 1998-1 (Portugal)
- EN 1998-1 (Romania)
- MS EN 1998-1 (Malaysia)
- SS EN 1998-1 (Singapore)
- UNE-EN 1998-1 (Spain)
- Published on
- 2021.e
Available installation languages
As of the 2021.e version, StruBIM Shear Walls can be installed in Catalan, English, French, Italian, Portuguese and Spanish. In previous versions, the program could only be installed in English and Spanish.
- Published on
- 2021.e
Code implementation. Eurocodes 8
- EN 1998-1 (UE)
- EN 1998-1 (Bulgaria)
- UNE-EN 1998-1 (Spain)
- NF EN 1998-1 (France)
- NP EN 1998-1 (Portugal)
- EN 1998-1 (Romania)
- MS EN 1998-1 (Malaysia)
- SS EN 1998-1 (Singapore)
Implemented in StruBIM Shear Walls.
- Published on
- 2021.e
Code implementation. Eurocodes 2
- EN 1992-1 (EU)
- EN 1992-1 (Bulgaria)
- UNE-EN 1992-1 (Spain)
- NF EN 1992-1 (France)
- NP EN 1992-1 (Portugal)
- SR EN 1992-1 (Romania)
- MS EN 1992-1 (Malaysia)
- SS EN 1992-1 (Singapore)
Implemented in StruBIM Shear Walls.
- Published on
- 2021.e
Optimisation in the analysis process
The analysis process has been optimised to obtain intermediate results and so speed up the on-screen view when the section of the wall is changed. This optimisation is most noticeable when the number of combinations is higher.
- Published on
- 2021.b
New panel for graphical representation of forces
- Published on
- 2021.b




